What I do
Five ways I engage. Each one starts with a diagnosis and ends with a program that can be governed.
Program Recovery
Diagnose failure points, re-establish ownership and decision rights, and restore a structured operating cadence with measurable milestones.
When programs have lost execution control, missed critical milestones, or stalled under conflicting priorities and absent governance.
Programs stabilized within 30 to 90 daysEnterprise Delivery
Lead end-to-end delivery across cloud migrations, DevOps transformations, and SaaS implementations in regulated, security-constrained environments.
When the initiative is too complex, too visible, or too regulated for a conventional project management approach.
Delivery with executive accountability at every stageGlobal Team Leadership
Drive alignment across distributed teams, vendors, and time zones. Establish clear ownership, reporting cadence, and decision frameworks that scale.
When multi-vendor, multi-region structures have created coordination failure and accountability gaps.
Unified execution across geographies and contractsExecutive Governance
Design and implement governance frameworks, escalation paths, and reporting structures that give leadership the visibility and decision data they need.
When executives are receiving status updates but lack the operational clarity to make confident, timely decisions.
Governance that drives decisions, not just reportsAI and GenAI Program Delivery
Take AI initiatives from pilot to production in regulated environments: safety and evaluation frameworks, LLM-powered applications, data platforms, and the governance that ties them to business outcomes.
When the AI proof of concept has been stuck for months, nobody owns the path to production, and compliance questions have no clear answers.
AI programs delivered to production with clinical-grade governance. Proven at Mayo Clinic with Google Cloud PSO.The first twelve weeks
Five workstreams, not five phases. They overlap on purpose: control has to exist before risk can be governed, and cadence has to hold before a release can be trusted. Select any one.
Immediate command and control
Executive status report live from day one. One-page program snapshot covering scope, critical milestones, decision logs, and open risks, giving leadership full visibility before the end of week one.
Risk and issue control
Structured risk register with owners, thresholds, and escalation paths. Issues stop falling through the cracks.
Dependency map
Cross-team and cross-vendor mapping with dates and blockers surfaced. Gridlock eliminated before it hits the critical path.
Operating cadence
Meeting structure rebuilt around decisions, not updates. Every session ends with a clear owner and a clear next action.
Release readiness pack
Go/No-Go criteria, cutover sequencing, rollback procedures, and executive sign-off tracking. Everything needed to protect the go-live.
Two things run underneath all of it and never stop: a live executive status, and a named owner on every open decision.
What the deliverables actually look like
Describing a deliverable is easy. These are the three that carry the most weight, rendered as they arrive.
Invented program, invented numbers. The format, the fields and the discipline are the real ones. Nothing here comes from a client.
Critical path
| Card tokenisation cutover | 28 Feb | On track |
| Settlement reconciliation UAT | 04 Mar | At risk, 5 days |
| Production dress rehearsal | 08 Mar | Not started |
Decisions taken this week
- Legacy gateway stays live for 30 days post cutover. Owner: T. Alvarez. 27 Feb.
- Reconciliation scope reduced to card and SEPA for wave one. Owner: M. Okonkwo. 25 Feb.
Decisions I need from you
- Approve two additional UAT testers, or accept a five day slip on settlement. Needed by 03 Mar.
- Name the accountable owner for post go-live incident triage. Needed by 06 Mar.
Top risks
- Vendor certification window closes 06 Mar and cannot move.
- Reconciliation defect rate at 4.1%, threshold is 2%.
| ID | Risk | Owner | Threshold | Escalates to | Review |
|---|---|---|---|---|---|
| R-01 | Vendor certification slot cannot be rebooked if missed | T. Alvarez | Not booked by 28 Feb | Steering, same day | Weekly |
| R-02 | Reconciliation defect rate above tolerance at UAT exit | M. Okonkwo | Above 2% on 04 Mar | CTO | Twice weekly |
| R-03 | Single engineer holds settlement domain knowledge | R. Bhatt | No second engineer by 01 Mar | Delivery lead | Weekly |
| R-04 | Rollback untested against production data volumes | S. Lindqvist | Untested by 08 Mar | Steering, blocks Go | Weekly |
Four rows, not forty. A register nobody reads governs nothing.
Go / No-Go criteria
| Criterion | Pass condition | Status | Signs |
|---|---|---|---|
| UAT defect rate | Below 2%, zero severity one | Not met, 4.1% | M. Okonkwo |
| Rollback rehearsed | Executed on production volumes | Pending | S. Lindqvist |
| Incident owner named | A person, on call, 24 hours | Not met | CTO |
| Vendor certification | Written confirmation received | Met, 26 Feb | T. Alvarez |
Cutover sequence
- 22:00 Freeze. Traffic to legacy gateway.
- 22:40 Migrate. Decision point at 23:30.
- 00:15 Smoke tests. Abort if any fail.
- 06:00 Business validation, then release the freeze.
Rollback
Trigger: any smoke test fails, or reconciliation drift above 0.5% in the first four hours. Executes in 40 minutes. Decision belongs to one named person on the bridge, not the room.